How Did SMSCL Help?
Client: EOG Resources Trinidad Limited (“EOG”)
EOG Resources Trinidad Limited (“EOG”) Tank Farm Condensate Metering System consist of two (2) parallel metering trains to fiscalize all export condensate. SMSCL was contracted to install one new metering train and tie-in to the new 6-inch export pipeline that was installed in their Phase 1 Project.
The works were required to be executed on an operational plant with the requirement to be completed such that, downtime to the facility was to be minimal. One (1) process shutdown was scheduled to facilitate the modification of the condensate metering skid inlet spool.
• Shop Fabrication & installation • Demolition of piping components on inlet off condensate metering skid • Installation of piping components, associated appurtenances and structural skid • Field touch-up painting • Testing & Commissioning • Hand-Over • Close-Out